Other Services

CBM Pipeline Network Optimization:

It Includes Analysis of pressure drop between well head/ manifold and GGS suction to locate line leakage, Flow restrictions due to water accumulation and analysis of losses (Across bends, fittings, frictional losses etc. ) in CBM Pipeline networks.

tutelage-courses1

Field Development Planning:

  • One of the main challenges for the oil and gas industry includes the proper maintenance of wells. This includes determining the optimal way to develop and produce from an oil or gas field that successfully manages risks, uncertainty and value to stakeholders.
  • FDP studies lay out the necessary information for oil and gas producers to weigh out all the economic decisions that has to be made for the project.
  • It involves integration of Environmental impact, G&G, Reservoir & Production Engineering, Infrastructure, Well design, Well completion design, Surface facilities, Economics etc.
Top